
New TopShim run:

version = topshim 2.0.0
date = 2024-07-04
time = 17:48:48.519
command = topshim  convcomp tuneaxyz

1D SHIMMING

Parameters:

maximum order = 5
probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm
optimisation parameters = ls
linewidth 1H = 0.10 Hz
envelope shape / strictness = 2.00 / 200

Results:

tune lock level increase = 1.6

initial B0 stdDev = 3.11 Hz
sample size = 2.66 cm, position = 0.10 cm
final B0 stdDev = 0.31 Hz > improvement = 10.0
envelope width = 0.54 Hz

Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	+78
Z2	-38
Z3	+106
Z4	-321
Z5	+119
X	-68
Y	+159

duration = 4 min 29 sec
completed successfully
finished Thu Jul  4 17:53:16 2024


========================================================================
